Reactor
Decommissioning
History Overview TMI-2 was a commercial power PWR reactor. It had a generating capacity of 792 MWe and 2772 MWt. It operated from December 1978 to March 1979 when a partial meltdown occurred. Amount of full power days was relatively low. The "TMI-2 Recovery" effort required some internals removal and segmentation to gain access to the bottom of the RV. This work was not called decommissioning since it had not been decided if the reactor would be repaired or not. Post-Defueling Monitoring Storage began December 1993, however approximately 1% of the fuel and debris remains in the reactor vessel and piping. Currently no significant dismantlement is underway. It is scheduled to be decommissioned with Unit 1 in 2014. Reactor Decommissioning
Specifics Internals Removal Core boring to segment the Lower Grid Top Rib section was performed during or before 1988. PCI Energy Services performed segmentation of the Lower Core Support Assembly in 1988 and 1989. This was done remotely underwater using primarily thermal cutting (plasma torch). PCI also claims to have used a Rotary Abrasive Saw (grinder) and Abrasive Water Jet (we have conflicting reports on this and are looking for more information). It is believed that some high pressure water cutting was done on core material but only as testing. Reactor Vessel Removal Segmentation
and Packaging Plan (S&P Plan) Key People
Contractors Comments Related Publications and Documents
References Click here to return to the Reactor Decommissioning History main page.
|
|||||||||||||